<?xml version="1.0"?>
<?xml-stylesheet type="text/css" href="http://www2.mdanderson.org/depts/cpm/standards/rss/rssStyle.css" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">

<channel>

<title>Integrated Automation (BAS) Updates - Owner's Design Guidelines</title>
<description>Update Announcements are Catagorized as Follows: Specifications by CSI Division; Guideline Elements by Section Letter, Supplemental Resources by Subject Matter, and General.</description>
<link>http://www2.mdanderson.org/depts/cpm/standards/rss/odg_bas_updates.xml</link>

<atom:link href="http://www2.mdanderson.org/depts/cpm/standards/rss/odg_bas_updates.xml" rel="self" type="application/rss+xml" />

<item>
    <title>HVAC Control Contract Document Requirements – Examples of Design &amp; Control Strategy Supported by MD Anderson - 050913</title>
    <description>
      Revised drawing template for OAHU With Fan Array Systems: APOAFA. Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/bas.html#edcs</link>
    <guid isPermaLink="false">BAS 050913</guid>
    <pubDate>Thu, 09 May 2013 08:28:11 CDT</pubDate>
  </item>  
    
<item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 10 – Bas Basic Materials, Interface Devices, And Sensors - Retrofit Projects - MS022613</title>
    <description>
      Revised existing parameters of instruments and narrowed the span to identify the instruments as critical devices for energy measurement requirements. Paragraphs 2.08 A., A.1,2, B., E.1.(added a,b,) Revised F.1.(added a,b.) deleted F.2, and revised H.1.   
      - Please direct Questions and Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2010.doc</link>
    <guid isPermaLink="false">25 11 10 MS022613</guid>
    <pubDate>Tue, 26 Feb 2013 08:33:15 CDT</pubDate>
  </item>

  <item>
    <title>HVAC Control Contract Document Requirements – Examples of Design &amp; Control Strategy Supported by MD Anderson - 022613</title>
    <description>
      Added drawing template for OAHU With Fan Array Systems: APOAFA. Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/bas.html#edcs</link>
    <guid isPermaLink="false">BAS 022613</guid>
    <pubDate>Tue, 26 Feb 2013 08:33:01 CDT</pubDate>
  </item>
    
  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 10 – Bas Basic Materials, Interface Devices, And Sensors - Retrofit Projects - MS013113</title>
    <description>
      Clarified piping materials for pneumatic piping. Paragraph 2.02 A.
      - Please direct Questions and Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2010.doc</link>
    <guid isPermaLink="false">25 11 10 MS013113</guid>
    <pubDate>Thu, 31 Jan 2013 08:44:33 CDT</pubDate>
  </item>  
  
  <item>
    <title>HVAC Control Contract Document Requirements – Examples of Design &amp; Control Strategy Supported by MD Anderson - 122012</title>
    <description>
      Added drawing templates for Stairwell Pressurization Fan (SPF) Systems: APSPF1PC and APSPF2RE. Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/bas.html#edcs</link>
    <guid isPermaLink="false">BAS 122012</guid>
    <pubDate>Thu, 20 Dec 2012 08:44:20 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 00 – Bas Basic Materials, Interface Devices, And Sensors - MS082812</title>
    <description>
      Updated Tek-Air Data and also deleted last statement in 2.11 A, revised 2.11 temp from 300 to 200 degree F. and deleted 2.11 B. 3.
       - Please direct Questions and Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2000.doc</link>
    <guid isPermaLink="false">25 11 00 MS082812</guid>
    <pubDate>Tue, 28 Aug 2012 08:31:14 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 10 – Bas Basic Materials, Interface Devices, And Sensors - Retrofit Projects - MS082812</title>
    <description>
      Revise wire gage to 22 gage  diameter wire. Paragraph 2.02 D. 1.
       - Please direct Questions and Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2010.doc</link>
    <guid isPermaLink="false">25 11 10 MS082812</guid>
    <pubDate>Tue, 28 Aug 2012 08:31:13 CDT</pubDate>
  </item>  
  
  <item>
    <title>HVAC Control Contract Document Requirements – Examples of Design &amp; Control Strategy Supported by MD Anderson - 031512</title>
    <description>
      Added drawing template for General Lab Exhaust (4-Pack) Fan System: APGLE4FS. Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/bas.html#edcs</link>
    <guid isPermaLink="false">BAS 031512</guid>
    <pubDate>Thu, 15 Mar 2012 08:20:15 CDT</pubDate>
  </item>
  <!-- 
  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 00 – Bas Basic Materials, Interface Devices, And Sensors - MS112211</title>
    <description>
      Modifications address averaging sensor maximum lengths allowed and freeze protection minimum coverage of coils. Paragraphs 2.08 G. and H.
      Please direct Questions and Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2000.doc</link>
    <guid isPermaLink="false">25 11 00 MS112211</guid>
    <pubDate>Tue, 22 Nov 2011 08:41:12 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 10 – Bas Basic Materials, Interface Devices, And Sensors - Retrofit Projects - MS112211</title>
    <description>
      Modifications address averaging sensor maximum lengths allowed and freeze protection minimum coverage of coils. Paragraph 2.08 D.
      Please direct Questions and Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2010.doc</link>
    <guid isPermaLink="false">25 11 10 MS112211</guid>
    <pubDate>Tue, 22 Nov 2011 08:41:11 CDT</pubDate>
  </item>  
  
  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 00 – Bas Basic Materials, Interface Devices, And Sensors - MS102511</title>
    <description>
      Included additional requirements for BAS Control Panels. Paragraphs 2.02 F. 1., 4. and 5.
      Please direct Questions and Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2000.doc</link>
    <guid isPermaLink="false">25 11 00 MS102511</guid>
    <pubDate>Tue, 25 Oct 2011 08:38:15 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 10 – Bas Basic Materials, Interface Devices, And Sensors - Retrofit Projects - MS102511</title>
    <description>
      Included additional requirements for BAS Control Panels. Paragraphs 2.02 E. 1., 4. and 5.
      Please direct Questions and Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2010.doc</link>
    <guid isPermaLink="false">25 11 10 MS102511</guid>
    <pubDate>Tue, 25 Oct 2011 08:38:15 CDT</pubDate>
  </item>  
  
  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 14 00 - BAS Field Panels - MS092211</title>
    <description>Added requirements for BAS point expansion modules. Paragraph 2.04 B. - Please direct Questions and Comments to Victor Juel at 713-563-3777.</description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2014%2000.doc</link>
    <guid isPermaLink="false">25 14 00 MS092211</guid>
    <pubDate>Thu, 22 Sep 2011 08:17:15 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 14 10 - BAS Field Panels (Retrofit) - MS092211</title>
    <description>Added requirements for BAS point expansion modules. Paragraph 2.03 O.- Please direct Questions and Comments to Victor Juel at 713-563-3777.</description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2014%2010.doc</link>
    <guid isPermaLink="false">25 14 10 MS092211</guid>
    <pubDate>Thu, 22 Sep 2011 08:17:14 CDT</pubDate>
  </item>  
  
  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 00 – Bas Basic Materials, Interface Devices, And Sensors - MS080411</title>
    <description>
      Paragraph 3.02 F. 5. C. - Added Requirements for RJ11 modular jack plates.
      Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2000.doc</link>
    <guid isPermaLink="false">25 11 00 MS080411</guid>
    <pubDate>Thu, 04 Aug 2011 08:26:11 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 10 – Bas Basic Materials, Interface Devices, And Sensors - Retrofit Projects - MS080411</title>
    <description>
      Paragraph 3.01 D. 5. C. - Added Requirements for RJ11 modular jack plates.
      Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2010.doc</link>
    <guid isPermaLink="false">25 11 10 MS080411</guid>
    <pubDate>Thu, 04 Aug 2011 08:26:10 CDT</pubDate>
  </item>  
  
  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 00 10 - Building Automation Systems (BAS) General - Retrofit Projects - MS070711</title>
    <description>
      Added requirements for point counts. Paragraph 1.05 D. 1. c.
      Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2000%2010.doc</link>
    <guid isPermaLink="false">25 00 10 MS070711</guid>
    <pubDate>Thu, 07 Jul 2011 08:37:22 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 00 – Bas Basic Materials, Interface Devices, And Sensors - MS070711</title>
    <description>
      Added location and identification requirements for relays. Paragraph 2.28 G. 1. d &amp; f.
      Added Functional Devices as an acceptable manufacturer of relays. Paragraph 2.28 G. 1. g.
      Added label requirements for low volage wiring/cables. Paragraph 3.02 F. 5.
      Added statement forbidding the use of wire nuts in panels. Paragraph 3.02 F. 6.
      Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2000.doc</link>
    <guid isPermaLink="false">25 11 00 MS070711</guid>
    <pubDate>Thu, 07 Jul 2011 08:37:21 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 09 - BAS Operator Interfaces - MS070711</title>
    <description>
      Added requirement for laser printer in lieu of a dot matrix. Paragraph 2.05 A.
      Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/div25/25%2011%2009.doc</link>
    <guid isPermaLink="false">25 11 09 MS070711</guid>
    <pubDate>Thu, 07 Jul 2011 08:37:20 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 10 – Bas Basic Materials, Interface Devices, And Sensors (Retrofit)- MS070711</title>
    <description>
      Added location and identification requirements for relays. Paragraph 2.17 F. 1. a &amp; c.
      Added label requirements for low volage wiring/cables. Paragraph 3.01 D. 5.
      Added statement forbidding the use of wire nuts in panels. Paragraph 3.01 D. 6.
      Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2010.doc</link>
    <guid isPermaLink="false">25 11 10 MS070711</guid>
    <pubDate>Thu, 07 Jul 2011 08:37:19 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 19 - BAS Operator Interfaces - Retrofit - MS070711</title>
    <description>
      Added requirement for laser printer in lieu of a dot matrix. Paragraph 2.04 A.
      Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/div25/25%2011%2019.doc</link>
    <guid isPermaLink="false">25 11 19 MS070711</guid>
    <pubDate>Thu, 07 Jul 2011 08:37:18 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 15 10 - BAS Software and Programming (Retrofit) - MS070711</title>
    <description>
      Added graphic resolution requirements. Paragraph 3.04 A.
      Added link requirements for sequence of operations and control drawings. Paragraph 3.04 B. 5. a &amp; b. 
      Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2015%2010.doc</link>
    <guid isPermaLink="false">25 15 10 MS070711</guid>
    <pubDate>Thu, 07 Jul 2011 08:37:17 CDT</pubDate>
  </item> 
  
  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 10 – Bas Basic Materials, Interface Devices, And Sensors (Retrofit)- MS050511</title>
    <description>
      Added Blemo valves to spec.
      Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2010.doc</link>
    <guid isPermaLink="false">25 11 10 MS050511</guid>
    <pubDate>Thu, 05 May 2011 08:30:03 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 00 – Bas Basic Materials, Interface Devices, And Sensors - MS042611</title>
    <description>
      Added 2.02 C 4 a &amp; b to require BAS low voltage cables to have identification labels.
      Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2000.doc</link>
    <guid isPermaLink="false">25 11 00 MS042611</guid>
    <pubDate>Tue, 26 Apr 2011 08:24:12 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 10 – Bas Basic Materials, Interface Devices, And Sensors (Retrofit)- MS042611</title>
    <description>
      Added 2.02 B 4 a &amp; b to require BAS low voltage cables to have identification labels.
      Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2010.doc</link>
    <guid isPermaLink="false">25 11 10 MS042611</guid>
    <pubDate>Tue, 26 Apr 2011 08:24:10 CDT</pubDate>
  </item> 
  
  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 00 10 - Building Automation Systems (BAS) General - Retrofit Projects - MS030311</title>
    <description>
      Added paragraph 1.05 D.c. - &quot;All subcontracts greater than $10K shall be competitively priced by a minimum of two owner approved subcontractors. Both subcontract proposals shall be fully disclosed.&quot;
      Please direct Questions or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2000%2010.doc</link>
    <guid isPermaLink="false">25 00 10 MS030311</guid>
    <pubDate>Thu, 03 Mar 2011 08:36:31 CDT</pubDate>
  </item>
    
  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 15 10 - BAS Software and Programming (Retrofit) - MS072210</title>
    <description>
      Clarified point naming requirements. Paragraph 2.01 B. Please direct Question or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2015%2010.doc</link>
    <guid isPermaLink="false">25 15 10 MS072210</guid>
    <pubDate>Thu, 22 Jul 2010 08:32:23 CDT</pubDate>
  </item>  
  
  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 00 – Bas Basic Materials, Interface Devices, And Sensors - MS052510</title>
    <description>
      Included BAS low voltage wiring/cables, removed color/lable table and referenced specification 27 05 53 for identification requirements for low-voltage cables. Paragraph 2.02 C. Please direct Question or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2000.doc</link>
    <guid isPermaLink="false">25 11 00 MS052510</guid>
    <pubDate>Tue, 25 May 2010 08:42:23 CDT</pubDate>
  </item>
  
  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 10 – Bas Basic Materials, Interface Devices, And Sensors  (Retrofit) - MS052510</title>
    <description>
      Included BAS low voltage wiring/cables and referenced specification 27 05 53 for identification requirements for low-voltage cables. Paragraph 2.02 B. Please direct Question or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2010.doc</link>
    <guid isPermaLink="false">25 11 10 MS052510</guid>
    <pubDate>Tue, 25 May 2010 08:42:21 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 00 - BAS Basic Materials, Interface Devices, and Sensors - MS040110</title>
    <description>
      2.13 B. - Added location and annunciation requirements for general air service manual reset devices. 2.28 C. - Added location and annunciation requirements for low temperature detectors. 2.28 I. - Added ventilation requirements for control transformers. Please direct Question or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2000.doc</link>
    <guid isPermaLink="false">25 11 00 MS040110</guid>
    <pubDate>Thu, 01 Apr 2010 08:34:35 CDT</pubDate>
  </item>

  <item>
    <title>CSI Division 25 - Integrated Automation, Section 25 11 10 – Bas Basic Materials, Interface Devices, And Sensors  (Retrofit) - MS040110</title>
    <description>
      2.08 C. 2. - Added 10,000 ohms sensing element for the auxiliary temperature sensor for air terminal application specific controllers. 2.12 B. - Added location and annunciation requirements for general air service manual reset devices. 2.17 B. - Added location and annunciation requirements for low temperature detectors. 2.17 H. - Added ventilation requirements for control transformers. Please direct Question or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2010.doc</link>
    <guid isPermaLink="false">25 11 10 MS040110</guid>
    <pubDate>Thu, 01 Apr 2010 08:34:33 CDT</pubDate>
  </item>  
  
  <item>
    <title>HVAC Control Contract Document Requirements – Specialty Equipment Control Library Identification Matrix - 032510</title>
    <description>
      Added drawing templates for Phoenix controllers: LLEB1-02, LLEB1-12 &amp; LLEB1-21. Please direct Question or Comments to Victor Juel at 713-563-3777.
    </description>
    <link>http://www2.mdanderson.org/depts/cpm/standards/bas.html#sec</link>
    <guid isPermaLink="false">BAS 032510</guid>
    <pubDate>Thu, 25 Mar 2010 08:23:16 CDT</pubDate>
  </item>
   
	<item>
		<title>CSI Division 25 - Integrated Automation, Section 25 00 00 – Building Automation Systems (Bas) General - MS082009</title>
		<description>
			Replaced the reference to Design Guidelines Element Z - IS Network Services &amp; Telecommunication Premises Distribution
			System Standards with reference to the Division 27 specifications. Added requirement that Owner approval must be obtained to utilize Network Data cable trays for BAS secondary LAN. Paragraphs 1.07 B. 2., C. 2. and C. 3. Please direct Question or Comments to Victor Juel at 713-563-3777.
		</description>
		<link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2000%2000.doc</link>
		<guid isPermaLink="false">25 00 00 MS082009</guid>
		<pubDate>Thu, 20 Aug 2009 07:33:26 CDT</pubDate>
	</item>

	<item>
		<title>CSI Division 25 - Integrated Automation, Section 25 11 00 - BAS Basic Materials, Interface Devices, and Sensors - MS082009</title>
		<description>Replaced the reference to Design Guidelines Element Z - IS Network Services &amp; Telecommunication Premises Distribution
			System Standards with reference to the Division 27 specifications. Paragraph 2.02 C. 2. Please direct Question or Comments to Victor Juel at 713-563-3777.</description>
		<link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2000.doc</link>
		<guid isPermaLink="false">25 11 00 MS082009</guid>
		<pubDate>Thu, 20 Aug 2009 07:33:24 CDT</pubDate>
	</item>

	<item>
		<title>CSI Division 25 - Integrated Automation, Section 25 11 10 – Bas Basic Materials, Interface Devices, And Sensors  (Retrofit) - MS082009</title>
		<description>
			Replaced the reference to Design Guidelines Element Z - IS Network Services &amp; Telecommunication Premises Distribution
			System Standards with reference to the Division 27 specifications. Paragraph 2.02 B. 2. Please direct Question or Comments to Victor Juel at 713-563-3777.
		</description>
		<link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2011%2010.doc</link>
		<guid isPermaLink="false">25 11 10 MS082009</guid>
		<pubDate>Thu, 20 Aug 2009 07:33:22 CDT</pubDate>
	</item>

	<item>
<title>CSI Division 25 - Integrated Automation, Section 25 11 00 - BAS Basic Materials, Interface Devices, and Sensors - MS080609</title>
<description>Deleted the sentence &quot;This wiring is not required to be plenum rated.&quot; and made additional tweaks to related verbiage. Paragraphs 2.02 C.3.a.; D.1.a. and E.1.a. Please direct Question or Comments to Victor Juel at 713-563-3777.</description>
<link>http://www2.mdanderson.org/depts/cpm/standards/specs.htm#div25</link>
<guid isPermaLink="false">25 11 00 MS080609</guid>
<pubDate>Thu, 06 Aug 2009 07:24:32 CDT</pubDate>
</item>

<item>
<title>CSI Division 25 - Integrated Automation, Section 25 11 10 - BAS Basic Materials, Interface Devices, and Sensors - Retrofit Projects - MS080609</title>
<description>Deleted the sentence &quot;This wiring is not required to be plenum rated.&quot; and made additional tweaks to related verbiage. Paragraphs 2.02 B.3.a.; C.1.a. and D.1.a. Please direct Question or Comments to Victor Juel at 713-563-3777.</description>
<link>http://www2.mdanderson.org/depts/cpm/standards/specs.htm#div25</link>
<guid isPermaLink="false">25 11 10 MS080609</guid>
<pubDate>Thu, 06 Aug 2009 07:24:30 CDT</pubDate>
</item>

<item>
<title>CSI Division 25 - Integrated Automation, Section 25 14 00 - BAS Field Panels - MS063009</title>
<description>Added statement which directs the controls contractor to follow instruction per specification 26 for electrical installation instruction. Paragraph 3.02, C. - Please direct Question or Comments to Victor Juel at 713-563-3777.</description>
<link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2014%2000.doc</link>
<guid isPermaLink="false">25 14 00 MS063009</guid>
<pubDate>Tue, 30 Jun 2009 08:15:17 CDT</pubDate>
</item>

<item>
<title>CSI Division 25 - Integrated Automation, Section 25 14 10 - BAS Field Panels (Retrofit) - MS063009</title>
<description>Added statement which directs the controls contractor to follow instruction per specification 26 for electrical installation instruction. Paragraph 3.01, C. - Please direct Question or Comments to Victor Juel at 713-563-3777.</description>
<link>http://www2.mdanderson.org/depts/cpm/standards/specs/div25/25%2014%2010.doc</link>
<guid isPermaLink="false">25 14 10 MS063009</guid>
<pubDate>Tue, 30 Jun 2009 08:15:16 CDT</pubDate>
</item>

<item>
<title>CSI Division 25 - Integrated Automation, Section 25 00 00 - Building Automation Systems (BAS) General - MS042408</title>
<description>Clarifications of verbiage conflicts with the Design Guidelines Element "Z" IS Network Services and Telecommunication Premises Distribution System Standards as requested by Long Pham, Director of Network Services.	General Revisions throughout document.
 Please direct Question or Comments to Victor Juel at 713-563-3777.</description>
<link>http://www2.mdanderson.org/depts/cpm/standards/specs.htm#div25</link>
<guid isPermaLink="false">25 00 00 MS042408</guid>
<pubDate>Thu, 24 Apr 2008 10:14:16 CDT</pubDate>
</item>

<item>
<title>CSI Division 25 - Integrated Automation, Section 25 00 10 - Building Automation Systems (BAS) General - Retrofit Projects - MS042408</title>
<description>Clarifications of verbiage conflicts with the Design Guidelines Element "Z" IS Network Services and Telecommunication Premises Distribution System Standards as requested by Long Pham, Director of Network Services.	General Revisions throughout document.
 Please direct Question or Comments to Victor Juel at 713-563-3777.</description>
<link>http://www2.mdanderson.org/depts/cpm/standards/specs.htm#div25</link>
<guid isPermaLink="false">25 00 10 MS042408</guid>
<pubDate>Thu, 24 Apr 2008 10:14:15 CDT</pubDate>
</item>

<item>
<title>CSI Division 25 - Integrated Automation, Section 25 11 00 - BAS Basic Materials, Interface Devices, and Sensors - MS042408</title>
<description>Clarifications of verbiage conflicts with the Design Guidelines Element "Z" IS Network Services and Telecommunication Premises Distribution System Standards as requested by Long Pham, Director of Network Services.	General Revisions throughout document.
 Please direct Question or Comments to Victor Juel at 713-563-3777.</description>
<link>http://www2.mdanderson.org/depts/cpm/standards/specs.htm#div25</link>
<guid isPermaLink="false">25 11 00 MS042408</guid>
<pubDate>Thu, 24 Apr 2008 10:14:14 CDT</pubDate>
</item>

<item>
<title>CSI Division 25 - Integrated Automation, Section 25 11 09 - BAS Operator Interfaces - MS042408</title>
<description>Clarifications of verbiage conflicts with the Design Guidelines Element "Z" IS Network Services and Telecommunication Premises Distribution System Standards as requested by Long Pham, Director of Network Services.	General Revisions throughout document.
 Please direct Question or Comments to Victor Juel at 713-563-3777.</description>
<link>http://www2.mdanderson.org/depts/cpm/standards/specs.htm#div25</link>
<guid isPermaLink="false">25 11 09 MS042408</guid>
<pubDate>Thu, 24 Apr 2008 10:14:13 CDT</pubDate>
</item>

<item>
<title>CSI Division 25 - Integrated Automation, Section 25 11 10 - BAS Basic Materials, Interface Devices, and Sensors - Retrofit Projects - MS042408</title>
<description>Clarifications of verbiage conflicts with the Design Guidelines Element "Z" IS Network Services and Telecommunication Premises Distribution System Standards as requested by Long Pham, Director of Network Services.	General Revisions throughout document.
 Please direct Question or Comments to Victor Juel at 713-563-3777.</description>
<link>http://www2.mdanderson.org/depts/cpm/standards/specs.htm#div25</link>
<guid isPermaLink="false">25 11 10 MS042408</guid>
<pubDate>Thu, 24 Apr 2008 10:14:12 CDT</pubDate>
</item>

<item>
<title>CSI Division 25 - Integrated Automation, Section 25 11 19 - BAS Operator Interfaces - Retrofit - MS042408</title>
<description>Clarifications of verbiage conflicts with the Design Guidelines Element "Z" IS Network Services and Telecommunication Premises Distribution System Standards as requested by Long Pham, Director of Network Services.	General Revisions throughout document.
 Please direct Question or Comments to Victor Juel at 713-563-3777.</description>
<link>http://www2.mdanderson.org/depts/cpm/standards/specs.htm#div25</link>
<guid isPermaLink="false">25 11 19 MS042408</guid>
<pubDate>Thu, 24 Apr 2008 10:14:11 CDT</pubDate>
</item>
-->

</channel>
</rss>

