Construction specification templates are available for use in conjunction with the design and construction of installations at all MD Anderson Cancer Center facilities.
Users of these documents are responsible for utilizing the proper version of a Master Construction Specification section for each project. The version of a specification section that is posted on this site at the time that the Design Development phase begins for a given project shall be used in the preparation of construction documents and for the purchasing of products, materials and/or equipment for installation.
This site permits viewing and downloading individual and⁄or multiple documents.
A zipped file of all documents within a Division is provided at the end of each Division listing.
To download all of the current Master Construction Specification sections within one zipped file, Click Here.
|
A - PROCUREMENT AND CONTRACTING REQUIREMENTS
|
DIVISION 00 |
INTRODUCTORY INFORMATION |
POSTED |
| 00 01 01 |
Project Manual Title Page |
06/11/13 |
| 00 01 10 |
Table of Contents |
05/30/13 |
| |
|
DIVISION 00 |
CONDITIONS OF THE CONTRACT |
POSTED |
|
2010 Uniform General and Supplementary General Conditions for the University of Texas System Building Construction Contracts |
06/30/11 |
| 00 25 00 |
Owner's Special Conditions |
06/11/13 |
| 00 25 00 A |
Attachment "A" - Harris County Minimum Wage Rate Determination
|
03/11/10 |
| 00 25 00 A |
Attachment "A" - Bastrop County Minimum Wage Rate Determination |
11/02/10 |
| 00 25 00 B |
Attachment "B" Facilities Planned Utility Outages Policy |
03/15/12 |
| 00 25 00 C |
Attachment "C" Project Sign Layout |
10/14/10 |
| 00 25 00 D |
Attachment "D" Bastrop Visitation and Tour Policy Statement and Medical Documentation Requirements |
03/15/12 |
| 00 73 16 |
Project Insurance (O.C.I.P.) |
01/08/13 |
| Div00.zip |
Download All Division 00 Sections |
06/11/13 |
| |
|
B - SPECIFICATIONS GROUP
|
DIVISION 01 |
GENERAL REQUIREMENTS |
POSTED |
| 01 31 00 |
Project Administration |
08/30/12 |
| 01 32 00 |
Project Planning and Scheduling |
03/09/10 |
| 01 35 16 |
Alteration Project Procedures |
03/05/13 |
| 01 35 23 |
Project Safety (O.C.I.P.) |
07/19/12 |
| 01 35 25 |
Owner Safety Requirements |
03/09/10 |
| 01 45 00 |
Project Quality Control |
08/30/12 |
| 01 57 23 |
Temporary Storm Water Pollution Control |
03/09/10 |
| 01 57 25 |
Dust Control Plan |
08/30/12 |
| 01 77 00 |
Project Closeout Procedures |
08/30/12 |
| 01 91 00 |
General Commissioning Requirements |
11/15/12 |
| Div01.zip |
Download All Division 01 Sections |
03/05/13 |
| |
|
B2 - FACILITY CONSTRUCTION SUBGROUP
|
DIVISION 02 |
EXISTING CONDITIONS |
POSTED |
| 02 41 19 |
Selective Demolition |
01/01/07 |
| |
DIVISION 03 |
CONCRETE |
POSTED |
| 03 30 00 |
Cast-In-Place Concrete |
12/08/11 |
| 03 54 16 |
Hydraulic Cement Underlayment |
01/01/07 |
| Div03.zip |
Download All Division 03 Sections |
12/08/11 |
| |
DIVISION 04 |
MASONRY |
POSTED |
| 04 20 00 |
Unit Masonry |
01/01/07 |
| |
DIVISION 05 |
METALS |
POSTED |
| 05 12 00 |
Structural Steel Framing |
01/01/07 |
| 05 21 00 |
Steel Joists Framing |
01/01/07 |
| 05 31 00 |
Steel Decking |
01/01/07 |
| 05 40 00 |
Cold-Formed Metal Framing |
01/01/07 |
| 05 50 00 |
Metal Fabrications |
01/01/07 |
| Div05.zip |
Download All Division 05 Sections |
01/01/07 |
| |
DIVISION 06 |
WOOD, PLASTICS AND COMPOSITES |
POSTED |
| 06 10 00 |
Miscellaneous Carpentry |
04/22/10 |
| 06 40 00 |
Architectural Woodwork |
03/04/10 |
| 06 61 16 |
Solid Surfacing Fabrications |
02/11/10 |
| Div06.zip |
Download All Division 06 Sections |
04/22/10 |
| |
DIVISION 07 |
THERMAL AND MOISTURE PROTECTION |
POSTED |
| 07 18 13 |
Pedestrian Traffic Coatings |
01/01/07 |
| 07 21 00 |
Thermal Insulation |
01/01/07 |
| 07 84 13 |
Penetration Firestopping |
09/13/12 |
| 07 95 13 |
Expansion Joint Cover Assemblies |
01/01/07 |
| Div07.zip |
Download All Division 07 Sections |
09/13/12 |
| |
DIVISION 08 |
OPENINGS |
POSTED |
| 08 11 13 |
Hollow Metal Doors and Frames |
04/01/10 |
| 08 12 16 |
Prefabricated Interior Aluminum Frames |
03/25/10 |
| 08 14 16 |
Flush Wood Doors |
03/25/10 |
| 08 31 13 |
Access Doors |
04/22/10 |
| 08 32 13 |
Aluminum Sliding ICU Doors |
03/25/10 |
| 08 33 23 |
Overhead Coiling Doors |
04/08/10 |
| 08 34 11 |
Rolling Counter Shutters |
04/08/10 |
| 08 35 13 |
Accordion Fire Doors |
04/22/10 |
| 08 41 13 |
Aluminum Entrances and Storefronts |
05/18/10 |
| 08 41 26 |
All-Glass Entrances |
05/06/10 |
| 08 42 29 |
Automatic Entrance Doors |
05/06/10 |
| 08 71 11 |
Finish Hardware |
02/26/13 |
| 08 81 00 |
Glass and Glazing |
04/22/10 |
| 08 90 00 |
Louvers and Vents |
08/12/10 |
| Div08.zip |
Download All Division 08 Sections |
02/26/13 |
| |
DIVISION 09 |
FINISHES |
POSTED |
| 09 22 16 |
Non-Structural Metal Framing |
10/23/12 |
| 09 22 23 |
Lath and Plaster |
01/01/07 |
| 09 24 00 |
Aggregate Coated Portland Cement Plaster (Marblecrete) |
01/01/07 |
| 09 29 00 |
Gypsum Drywall |
07/19/12 |
| 09 30 00 |
Tile |
06/28/12 |
| 09 51 00 |
Acoustical Ceilings |
11/22/11 |
| 09 65 13 |
Resilient Base and Accessories |
05/27/08 |
| 09 65 16 |
Resilient Sheet Flooring |
11/22/11 |
| 09 66 00 |
Terrazo |
03/21/13 |
| 09 68 00 |
Carpet |
01/01/07 |
| 09 69 00 |
Access Flooring |
01/01/07 |
| 09 72 00 |
Wall Coverings |
01/01/07 |
| 09 91 00 |
Painting |
03/21/13 |
| 09 97 00 |
Special Coatings |
01/01/07 |
| Div09.zip |
Download All Division 09 Sections |
03/21/13 |
| |
DIVISION 10 |
SPECIALTIES |
POSTED |
| 10 10 00 |
Visual Display Boards |
07/22/10 |
| 10 14 16 |
Building Plaque |
01/01/07 |
| 10 14 16 A |
Attachment "A" Building Plaque Drawing |
09/01/07 |
| 10 22 19 |
Demountable Partitions |
07/22/10 |
| 10 22 26.13 |
Folding Panel Partitions |
07/22/10 |
| 10 22 26.33 |
Accordian Folding Partitions |
09/30/10 |
| 10 26 00 |
Wall and Corner Guards |
07/22/10 |
| 10 28 13 |
Toilet and Bath Accessories |
01/01/07 |
| 10 44 00 |
Fire Extinguisher Cabinets and Accessories |
05/27/10 |
| 10 51 13 |
Metal Lockers |
09/30/10 |
| 10 56 26 |
Mobile High Density Shelving Systems |
12/08/11 |
| Div10.zip |
Download All Division 10 Sections |
12/08/11 |
| |
DIVISION 11 |
EQUIPMENT |
POSTED |
| 11 53 00 |
Laboratory Equipment |
01/01/07 |
| 11 53 13 |
Laboratory Fume Hoods |
11/06/12 |
| 11 53 53 |
Biological Safety Cabinets |
11/06/12 |
| Div11.zip |
Download All Division 11 Sections |
11/06/12 |
| |
DIVISION 12 |
FURNISHINGS |
POSTED |
| |
To Be Created By Project Architect |
|
| |
DIVISION 13 |
SPECIAL CONSTRUCTION |
POSTED |
| 13 21 00 |
Controlled Environmental Rooms |
06/28/12 |
| 13 49 00 |
Radiation Protection |
01/01/07 |
| Div13.zip |
Download All Division 13 Sections |
06/28/12 |
| |
DIVISION 14 |
CONVEYING SYSTEMS |
POSTED |
| 14 21 00 |
Electric Traction Elevators |
08/02/12 |
| |
|
B3 - FACILITY SERVICES SUBGROUP
|
DIVISION 20 |
COMMON FIRE SUPPRESSION, PLUMBING AND HVAC REQUIREMENTS |
POSTED |
| 20 01 00 |
Basic Fire Suppression, Plumbing and HVAC Requirements |
08/18/11 |
| 20 05 13 |
Motors |
05/01/12 |
| 20 05 16 |
Piping Expansion Compensation |
01/01/07 |
| 20 05 29 |
Supports and Sleeves |
05/17/12 |
| 20 05 48 |
Vibration Isolation |
04/25/13 |
| 20 05 53 |
Piping and Equipment Identification |
03/21/13 |
| 20 07 16 |
Equipment Insulation |
02/26/13 |
| 20 07 19 |
Piping Insulation |
02/26/13 |
| 20 08 00 |
Fire Suppression, Plumbing and HVAC Systems Commissioning |
01/01/07 |
| 20 08 13 |
Fire Suppression, Plumbing and HVAC Systems Prefunctional Checklists and Start-Ups (w/Attachments) |
01/01/07 |
| 20 08 16 |
Fire Suppression, Plumbing and HVAC Systems Functional Performance Tests (w/Attachments) |
01/01/07 |
| Div20.zip |
Download All Division 20 Sections |
04/25/13 |
| |
DIVISION 21 |
FIRE SUPPRESSION |
POSTED |
| 21 10 13 |
Wet Standpipe and Sprinkler Systems |
12/20/12 |
| 21 13 16 |
Preaction Sprinkler Systems |
04/26/11 |
| 21 31 13 |
Fire Pumps |
03/19/09 |
| Div21.zip |
Download All Division 21 Sections |
12/20/12 |
| |
DIVISION 22 |
PLUMBING |
POSTED |
| 22 05 33 |
Domestic Hot Water Heat Maintenance Tracing |
11/15/12 |
| 22 10 00 |
Plumbing Piping |
06/11/13 |
| 22 10 30 |
Plumbing Specialties |
04/05/12 |
| 22 11 23 |
Domestic Water Pressure Boosting Systems (VFD) |
11/15/12 |
| 22 11 24 |
Domestic Water Pressure Boosting Systems (Constant Speed) |
11/15/12 |
| 22 20 23 |
Natural Gas Piping |
03/17/11 |
| 22 31 16 |
Domestic Water Softeners |
11/15/12 |
| 22 33 13 |
Electric Instantaneous Domestic Water Heaters |
11/15/12 |
| 22 33 33 |
Electric Domestic Water Heaters (Point-of-Use) |
11/15/12 |
| 22 34 36 |
Domestic Water Heaters (Natural Gas Fired) |
12/01/09 |
| 22 35 23 |
Semi-Instantaneous Domestic Water Heaters (Hot Water) |
12/01/09 |
| 22 35 24 |
Semi-Instantaneous Domestic Water Heaters (Steam) |
12/01/09 |
| 22 40 00 |
Plumbing Fixtures |
11/15/12 |
| 22 45 00 |
Emergency Shower and Eye Wash Equipment |
12/01/09 |
| 22 60 00 |
Medical Vacuum and Gas Piping |
06/11/13 |
| 22 60 53 |
Laboratory Vacuum and Gas Piping |
06/11/13 |
| 22 61 19 |
Medical Air Compressor Systems |
06/11/13 |
| 22 62 19 |
Medical Vacuum Pump Systems |
06/11/13 |
| 22 62 21 |
Laboratory Vacuum Pump Systems (Rotary Claw) |
06/11/13 |
| 22 66 53 |
Laboratory Waste and Vent Piping (PP/Duriron) |
05/24/11 |
| 22 66 54 |
Laboratory Waste and Vent Piping (Glass/Duriron) |
12/01/09 |
| 22 66 55 |
Laboratory Waste and Vent Piping (Duriron) |
12/01/09 |
| 22 67 13 |
High Purity Water Systems (RO) |
11/15/12 |
| Div22.zip |
Download All Division 22 Sections |
06/11/13 |
| |
DIVISION 23 |
HEATING, VENTILATING AND AIR CONDITIONING |
POSTED |
| 23 05 13 |
Variable Frequency Drives |
10/16/07 |
| 23 05 90 |
Contractor Coordination with Testing, Adjusting and Balancing |
08/18/11 |
| 23 05 93 |
System Testing, Adjusting and Balancing |
05/05/11 |
| 23 07 13 |
Ductwork Insulation |
05/09/13 |
| 23 09 10 |
Laboratory Tracking Systems and Constant Volume Air Valves |
07/19/11 |
| 23 11 13 |
Fuel Oil Piping Systems |
08/28/12 |
| 23 21 13 |
Hydronic Piping |
04/11/13 |
| 23 21 14 |
Underground Pre-Insulated Hydronic Piping |
08/23/07 |
| 23 21 23 |
HVAC Pumps |
05/10/11 |
| 23 21 30 |
Hydronic Specialties |
10/23/12 |
| 23 22 13 |
Steam and Steam Condensate Piping |
11/02/10 |
| 23 22 30 |
Steam and Steam Condensate Specialties |
01/15/09 |
| 23 25 00 |
Water Treatment for HVAC Systems |
03/10/09 |
| 23 31 00 |
Ductwork |
03/21/13 |
| 23 33 00 |
Ductwork Accessories |
04/11/13 |
| 23 33 19 |
Sound Attenuators |
01/01/07 |
| 23 34 13 |
Inline Fans |
01/01/07 |
| 23 34 16 |
Centrifugal Fans |
01/01/07 |
| 23 34 23 |
Power Ventilators |
01/01/07 |
| 23 34 43 |
Laboratory High Plume Exhaust Fans |
12/13/12 |
| 23 36 00 |
Air Terminal Units |
10/23/12 |
| 23 37 00 |
Air Outlets and Inlets |
11/15/12 |
| 23 40 00 |
Filters |
04/11/13 |
| 23 40 13 |
Special Filter Systems |
10/23/12 |
| 23 51 00 |
Chimneys, Breechings and Stacks |
01/01/07 |
| 23 52 16 |
High Efficiency Condensing Hot Water Boilers |
04/25/13 |
| 23 52 39 |
Fire Tube Boilers |
08/18/11 |
| 23 52 40 |
Steam Boiler Burners (Dual Fuel) |
01/15/09 |
| 23 53 16 |
Deaerators .03 cc/Liter |
01/01/07 |
| 23 57 10 |
Unfired Steam Generators |
01/01/07 |
| 23 57 19 |
Shell and Tube Heat Exchangers |
01/07/07 |
| 23 57 20 |
Plate and Frame Heat Exchangers |
12/08/11 |
| 23 62 13 |
Packaged Air Cooled DX Air Conditioning Units |
04/11/13 |
| 23 64 16 |
Water Cooled Centrifugal Chillers |
10/23/12 |
| 23 64 20 |
Heat Recovery Chillers |
10/23/12 |
| 23 64 26 |
Air Cooled Rotary Screw Chillers |
10/23/12 |
| 23 65 00 |
Cooling Towers |
01/01/07 |
| 23 72 23 |
Energy Recovery Units |
04/11/13 |
| 23 73 13 |
Modular Air Handling Units |
04/25/13 |
| 23 73 22 |
Site Built Custom Air Handling Units |
02/26/13 |
| 23 73 23 |
Custom Air Handling Units |
04/11/13 |
| 23 73 24 |
Custom Air Handling Units with Fan Array Systems |
04/11/13 |
| 23 81 23 |
Computer Room Air Conditioning Units |
04/11/13 |
| 23 81 26 |
DX Split System Air Conditioners |
04/11/13 |
| 23 82 16 |
Duct Mounted Air Coils |
01/15/09 |
| 23 82 19 |
Fan Coil Units |
01/01/07 |
| 23 82 33 |
Electric Duct Heaters |
02/17/11 |
| 23 82 39 |
Unit Heaters |
07/15/08 |
| 23 84 13 |
Steam Grid Humidifiers |
01/01/07 |
| 23 84 14 |
Electric Steam Grid Humidifiers |
01/01/07 |
| Div23.zip |
Download All Division 23 Sections |
05/09/13 |
| |
DIVISION 25 |
INTEGRATED AUTOMATION |
POSTED |
| 25 00 00 |
Building Automation Systems (BAS) General |
08/20/09 |
| 25 00 10 |
Building Automation Systems (BAS) General (Retrofit Projects) |
07/07/11 |
| 25 08 00 |
BAS Commissioning |
01/01/07 |
| 25 08 10 |
BAS Commissioning (Retrofit Projects) |
01/01/07 |
| 25 11 00 |
BAS Basic Materials, Interface Devices and Sensors |
08/28/12 |
| 25 11 09 |
BAS Operator Interfaces |
07/07/11 |
| 25 11 10 |
BAS Basic Materials, Interface Devices, And Sensors (Retrofit Projects) |
02/26/13 |
| 25 11 19 |
BAS Operator Interfaces (Retrofit Projects) |
07/07/11 |
| 25 14 00 |
BAS Field Panels |
09/22/11 |
| 25 14 10 |
BAS Field Panels (Retrofit Projects) |
09/22/11 |
| 25 15 00 |
BAS Software and Programming |
01/01/07 |
| 25 15 10 |
BAS Software And Programming (Retrofit Projects) |
07/07/11 |
| 25 30 00 |
BAS Communication Devices |
01/01/07 |
| 25 30 10 |
BAS Communication Devices (Retrofit Projects) |
01/01/07 |
| Div25.zip |
Download All Division 25 Sections |
02/26/13 |
| |
DIVISION 26 |
ELECTRICAL |
POSTED |
| 26 01 00 |
Basic Electrical Requirements |
04/11/13 |
| 26 05 13 |
Cable and Terminations (Medium Voltage) |
02/11/10 |
| 26 05 19 |
Cable, Wire and Connectors, 600 Volt |
08/28/12 |
| 26 05 26 |
Grounding |
12/04/08 |
| 26 05 33 |
Raceways, Cable Trays, and Boxes |
08/28/12 |
| 26 05 73 |
Protective Relay and Device Coordination |
05/17/12 |
| 26 08 00 |
Electrical Systems Commissioning |
01/01/07 |
| 26 08 13 |
Electrical Systems Prefunctional Checklists and Start-Ups (w/Attachments) |
12/18/07 |
| 26 08 16 |
Electrical Systems Functional Performance Tests (w/Attachment) |
01/01/07 |
| 26 09 13 |
Power Status and Monitoring System |
07/23/09 |
| 26 13 00 |
Medium Voltage Switchgear |
06/02/11 |
| 26 22 13 |
Non-K-Factor Dry-Type transformers |
05/14/09 |
| 26 22 14 |
High Efficiency Harmonic Cancellation Transformers |
01/01/07 |
| 26 23 00 |
600 Volt Switchgear |
11/06/12 |
| 26 23 13 |
600 Volt Emergency Generator Paralleling Switchgear |
05/30/13 |
| 26 24 16 |
Panelboards |
03/03/11 |
| 26 24 19 |
Motor Control Centers |
01/01/07 |
| 26 25 13 |
Low Voltage Busways |
10/22/09 |
| 26 27 26 |
Wiring Devices |
04/11/13 |
| 26 28 13 |
Fuses, 600 Volt |
01/01/07 |
| 26 28 17 |
Motor and Circuit Disconnects |
01/01/07 |
| 26 29 14 |
Motor Starters |
01/01/07 |
| 26 32 13 |
Packaged Engine Generator Systems |
07/22/10 |
| 26 33 24 |
48V DC Battery System |
07/03/07 |
| 26 33 53 |
Three-Phase Uninterruptible Power Systems |
12/13/12 |
| 26 35 33 |
Power Factor Correction Equipment |
02/12/09 |
| 26 36 23 |
600 Volt Automatic Transfer Switches |
05/09/13 |
| 26 36 24 |
5kV Automatic Transfer Switches |
08/17/10 |
| 26 36 25 |
5kV Emergency Generator Paralleling Switchgear |
11/06/12 |
| 26 41 00 |
Lightning Protection System |
11/22/11 |
| 26 43 13 |
Transient Voltage Surge Suppressors |
06/02/11 |
| 26 51 00 |
Lighting Fixtures |
06/02/11 |
| Div26.zip |
Download All Division 26 Sections |
05/30/13 |
| |
DIVISION 27 |
COMMUNICATIONS |
POSTED |
| 27 00 00 |
Communications |
05/30/13 |
| 27 05 26 |
Grounding and Bonding for Communications Systems |
06/03/10 |
| 27 05 28 |
Pathways for Communications Systems |
06/28/12 |
| 27 05 43 |
Underground Ducts and Raceways for Communications Systems |
02/26/09 |
| 27 05 53 |
Identification for Low-Voltage Cables |
10/23/12 |
| 27 11 00 |
Communications Equipment Room Fittings |
11/02/10 |
| 27 13 00 |
Communications Backbone Cabling |
06/28/12 |
| 27 15 00 |
Communications Horizontal Cabling |
06/28/12 |
|
PLEASE COORDINATE WITH OWNER TO DEVELOP NURSE CALL SYSTEM SPECIFICATIONS FOR THE PROJECT. CONTACT TIM LECUYER (EMAIL) / (PH) 713-563-5030. |
|
| Div27.zip |
Download All Division 27 Sections |
05/30/13 |
| |
DIVISION 28 |
ELECTRONIC SAFETY AND SECURITY |
POSTED |
| 28 30 00 |
Fire Alarm and Smoke Detector Systems |
06/02/11 |
|
PLEASE COORDINATE WITH OWNER TO DEVELOP SECURITY SPECIFICATIONS FOR THE PROJECT. CONTACT LAURA OSWALT (EMAIL) / (PH) 713-794-5733. |
|
| Div28.zip |
Download All Division 28 Sections |
06/02/11 |
| |
DIVISION 31 |
EARTHWORK |
POSTED |
| |
To Be Created By Project Engineer |
|
| |
DIVISION 32 |
EXTERIOR IMPROVEMENTS |
POSTED |
| 32 80 00 |
Irrigation Systems |
04/26/11 |
| 32 90 00 |
Planting |
04/26/11 |
| 32 91 20 |
Exterior Landscape Maintenance |
04/26/11 |
| 32 92 13 |
Hydromulching |
04/26/11 |
| Div32.zip |
Download All Division 32 Sections |
04/26/11 |
| |
DIVISION 33 |
UTILITIES |
POSTED |
| |
To Be Created By Project Engineer |
|
| |
DIVISION 43 |
PROCESS GAS & LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT |
POSTED |
| 43 62 23 |
Vacuum Insulated Pipe |
11/02/10 |
| |